Termination Report

Wiki Article

All tasks related to the closure of Site-96 have been finalized. The detailed report outlines the results of the process.

Agents were removed from the site concurrent with the initiation of the termination protocols.

A comprehensive assessment of the site revealed negligible collateral consequences.

Ongoing analysis is warranted to assess the long-term effects of the shutdown sequence.

A detailed analysis will be forwarded to command upon completion of these investigations.

Site Report: Facility-96 - Breach Procedure Sigma

A full categorical breach has occurred at Site-96. The initial anomaly is a spatial displacement that appears to have compromised the material integrity of the containment field. All personnel are advised here to rapidly evacuate the site. Containment Protocol Omega is now in effect. Further details are pending analysis. Please await for further instructions.

Incident Log: 96-Alpha - Personnel Disappearance

On [Date] at approximately 14:32, a report of personnel disappearance was logged. The missing individual, designated as Unit 47, vanished from the secure zone during routine operations. All initial security protocols were activated upon discovery of the absence. A meticulous search was initiated within the designated perimeter, assisted by specialized teams. The cause behind the disappearance remains unclear, and investigations are in progress to ascertain the full circumstances.

Facility-96 Security Protocols Revised

Effective forthwith, all personnel assigned to Site-96 are required to comply with the newly implemented security protocols. These revisions, prompted by recent events, aim to improve the overall security posture of the facility and reduce the risk of intrusions. A comprehensive list of these revised protocols can be found attached in a document available through the secure server. All personnel are required to familiarize themselves with the updated protocols and demonstrate their understanding during the mandatory orientation scheduled for next week. Failure to follow these revised protocols will result in disciplinary action up to and including decommissioning.

Compliance with these revised protocols is imperative to maintaining the integrity and stability of Site-96.

Site 96 Anomaly Evaluation

This report details the mitigation strategies currently in effect at Site 96. The site is designated as a Level 4 anomaly containment zone due to the manifestation of an unidentified anomalous entity (UAE). Initial reports suggest the UAE possesses cognitive dissonance inducing properties.

Observations indicate a fluctuation in the anomaly's activity levels, with periods of extreme agitation}. This erratic behavior necessitates continuous monitoring and adaptation of site protocols. Further investigation is required to fully understand the nature and intentions of the UAE.

Subject Recovery Attempt - Site-96

Initiating Sequence ALPHA-12. Tertiary containment breach confirmed at Facility Gamma. Subject estimated to be in disoriented condition. Deploying tactical personnel as first line of defense. Requesting full containment protocol activation.

HQ awaiting further updates. This is a developing situation.

Report this wiki page